Lead Pipe Data by Area — Puerto Rico
78 areas across Puerto Rico with enough data for a dedicated breakdown.
- Adjuntas (4,822)
- Aguada (15,111)
- Aguadilla (26,249)
- Aguas Buenas (8,069)
- Aibonito (9,779)
- AñAsco (10,655)
- Arecibo (40,674)
- Arroyo (8,396)
- Barceloneta (10,473)
- Barranquitas (8,177)
- BayamóN (82,206)
- Cabo Rojo (28,066)
- Caguas (55,379)
- Camuy (14,135)
- CanóVanas (14,819)
- Carolina (67,657)
- CatañO (9,352)
- Cayey (18,660)
- Ceiba (5,934)
- Ciales (6,658)
- Cidra (15,438)
- Coamo (15,789)
- ComeríO (5,903)
- Corozal (11,083)
- Culebra (1,151)
- Dorado (15,038)
- Fajardo (17,190)
- Florida (4,863)
- GuáNica (8,814)
- Guayama (18,454)
- Guayanilla (8,018)
- Guaynabo (37,895)
- Gurabo (17,214)
- Hatillo (16,143)
- Hormigueros (7,262)
- Humacao (22,806)
- Isabela (20,598)
- Jayuya (4,391)
- Juana DíAz (18,514)
- Juncos (15,796)
- Lajas (11,846)
- Lares (11,514)
- Las MaríAs (3,200)
- Las Piedras (14,463)
- LoíZa (8,921)
- Luquillo (9,872)
- Manatí (18,539)
- Maricao (1,820)
- Maunabo (4,421)
- MayagüEz (39,595)
- Moca (13,881)
- Morovis (10,814)
- Naguabo (10,125)
- Naranjito (7,615)
- Orocovis (6,314)
- Patillas (7,193)
- PeñUelas (7,984)
- Ponce (62,555)
- Quebradillas (10,444)
- RincóN (7,892)
- RíO Grande (21,356)
- Sabana Grande (10,588)
- Salinas (12,179)
- San GermáN (14,863)
- San Juan (170,104)
- San Lorenzo (13,592)
- San SebastiáN (17,365)
- Santa Isabel (8,845)
- Toa Alta (24,665)
- Toa Baja (29,352)
- Trujillo Alto (26,742)
- Utuado (11,383)
- Vega Alta (15,129)
- Vega Baja (23,355)
- Vieques (5,294)
- Villalba (7,477)
- Yabucoa (10,435)
- Yauco (16,624)
Lead pipe replacement law in Puerto Rico
Puerto Rico has not set its own territory-specific lead service line replacement deadline beyond the federal requirement below. Unlike Washington, DC, Puerto Rico holds its own primacy under the Safe Drinking Water Act -- the Puerto Rico Department of Health has been the designated primacy agency since 1980 -- and implements the federal Lead and Copper Rule Improvements through PRASA's own Service Line Inventory Program rather than EPA administering the territory's water systems directly. EPA has separately committed over $28 million in federal funding specifically to help PRASA complete its islandwide inventory and lead pipe replacement work faster, which is a funding program, not an accelerated regulatory deadline.
Separately from any state law, the EPA's federal Lead and Copper Rule Improvements require every water system nationwide to submit a baseline inventory and an approved replacement plan by November 1, 2027, then fully replace all lead and "galvanized requiring replacement" lines under its control on a schedule of 10 years or less from that date, replacing at least 10% of its known lead/GRR lines per year. A narrow exception allows a longer schedule only for the roughly 1% of systems with an unusually dense concentration of lead lines, and partial (non-emergency) replacements are prohibited.
Known gaps in Puerto Rico coverage
An estimated ~100,000 residents (~3.1% of Puerto Rico's population) are served by roughly 242 small rural and community water systems outside PRASA, most organized through the Rural Aqueducts Program -- none of these publish a public GIS layer, download, or lookup tool found. A "not found" result for an address in one of these small rural systems means unpublished here, not confirmed lead-free.
- ~242 small non-PRASA rural/community water systems (Rural Aqueducts Program)